Start a custom project: what to send us

The more we know up front, the faster we can tell you what is feasible. Send what you have. A STEP file is ideal, but a description is enough to start.

What to send us

Any of these helps. None is required to get started.

  1. Your applicationWhat you measure or process, and in which instrument.
  2. Your drawingA STEP file if you have one. We support you with corrections and feasibility assessments.
  3. Media and conditionsSamples and solvents, temperature range, cleaning or sterilization.
  4. Optical requirementsWavelength range, transmission, flatness and surface requirements.
  5. Size and volumeLength, channel cross section and sample volume.
  6. Quantities and timingNumber of prototypes, expected series volume and target dates.
  7. DocumentationCertificates, traceability and standards such as ISO 13485.
  8. Target priceThe price you are aiming for, so we can design to it.

What we can typically do

Typical values. We always evaluate individual cases.

CapabilityTypical
LengthTypically 10 mm to 200 mm. Larger parts are also possible.
Sample volumeFrom sub-µL to several mL, depending on the application.
Channel sizeAn internal cross section of about 50 µm is feasible from a channel length of approx. 10 mm. Smaller is possible depending on geometry and wall thickness.
Optical flatnessBetter than λ/10 on polished surfaces.
MaterialsBorosilicate glass and synthetic fused silica.
TemperatureFused silica is stable well above 1000 °C.
Design filesSTEP preferred.
PrototypesTypically about 10–20 pieces.
SeriesFrom about 10–20 pieces a year up to four-digit volumes. Typical series are 50 to 500 pieces.
Lead timeAbout 6 months on average for prototypes in a joint development project. Flow cytometry base versions: about one week.
Documentation3.1 and 2.1 certificates, material certificates, inspection reports.

A note on quantities

To minimize the risk of damage when handling glass and fused silica, we always plan a certain over-delivery. Unit costs decrease with higher quantities, because the production effort is almost identical for 1 or 20 pieces, so the additional pieces are always charged as well.

Send us your brief

We check feasibility first and tell you what is realistic. Once a project starts you work directly with our development engineers.